Tailings
CAML is committed to responsible management throughout the lifecycle of its tailings facilities. This commitment is an integral part of our overall prioritisation of the safety and well-being of all project-affected persons, communities, stakeholders and the environment. In 2024, following a three-year implementation programme, CAML achieved conformance with the Global Industry Standard on Tailings Management (GISTM).
OUR APPROACH
At CAML we are firmly committed to the long-term environmental and socially responsible disposal of tailings. Tailings are not produced at Kounrad owing to the nature of the leaching operation. However, mineral waste materials are generated by mining and processing operations at Sasa, and these are managed in an effective and responsible manner.
The Sasa Tailings Storage Facilities (TSF) consistent of five tailings dams, which have been constructed using the downstream construction method, and a dry stack tailings (DST) storage facility which entered operation in Q1 2025. All of Sasa’s tailings dams are designed to take into account the specific environmental setting in which they are located, which includes but is not limited to, grain size, slope angle and height of dam wall above the pond.
At CAML we aim to minimise associated impacts with regards to waste management. This is why we have committed to transitioning to paste fill mining at Sasa, which will allow disposal of a significant proportion of tailings in cemented paste backfill underground to minimise the quantity of tailings stored on the surface.
DST will allow for a larger volume of material to be stored in a smaller footprint. This method, combined with the paste fill mining, will provide storage capacity for approximately 70% of Sasa’s Life of Mine (LoM) tailings to 2039, with the remaining approximately 30% to be stored in the existing TSF4.
Full details of Sasa’s TSFs and it’s DST facility can be found in our GISTM disclosure document at the following link: GISTM public disclosure document.
TAILINGS Policy
At CAML, we drafted our first standalone Tailings Policy in 2022, reaffirming our dedication to proactive, safe and sustainable tailings management. This policy underscores our commitment to protecting the safety and well-being of all project-affected persons, communities, stakeholders and the environment, and it is reviewed on an annual basis.
Our TAILINGS FACILITIES
There are five conventional tailings storage facilities and a DST facility at Sasa. Details of these facilities can be found in CAML’s GISTM disclosure document.
Global industry standard on Tailings Management
The Global Industry Standard on Tailings Management (GISTM) is based on 15 core principles spread across six topics, ranging from potentially affected communities, through design and construction, to facilities management and planned emergency response.
Adoption of the GISTM is not a legal requirement, though is required of members of the International Council on Mining & Metals (ICMM), an industry body comprising 24 of the world’s largest mining companies. CAML decided to adopt the GISTM on a voluntary basis to demonstrate its commitment to safe and sustainable mining practices.
Our conformance with the GISTM
CAML’s GISTM conformance has been independently audited by international consultants Knight Piésold (KP). See our GISTM public disclosures document for more information.
TAILINGS MANAGEMENT
CAML is committed to proactive, safe, and sustainable tailings management to protect the health and safety of our people, communities, and the environment in which we operate.
Our approach to TSF management is centred on strong governance and effective risk management. The CAML TSF Policy outlines our commitment to the safe management of TSFs, emphasising governance, risk management, transparency, emergency preparedness, and response and recovery in the event of a failure. For detailed information on the role of the CAML Board in overseeing our approach to, and delivery on, sustainability, please refer to our annual Sustainability Report.